8 Aug 2011
Chch beaches set to reopen by spring after pipelines fixed
The beaches of Christchurch are expected to re-open by spring, now nearly 12 kilometres of wrecked sewerage pipelines have been repaired.
The beaches of Christchurch are expected to re-open by spring, now nearly 12 kilometres of wrecked sewerage pipelines have been repaired.